Call us: 07539 687 023     | E-mail: info@stepaheadflooring.co.uk
Lounge floor filled and sanded

The first thing Step Ahead Flooring do when installing any flooring is to thoroughly inspect the existing floor.

Any bumps or irregularities in the sub-floor will cause problems later on in the process and may leave marks and can create gaps in your new floor. The sub-floor should be stable and firmly fixed, it cannot be soft, damaged or loose.

We will check wooden floors for any traces of mould or insect infestations and make sure that the moisture content of any floor does not exceed the recommended levels.

Step Ahead Flooring will ensure:

  • The sub-floor is completely flat.

  • Any small bumps are removed by sanding or scraping.

  • If needed an appropriate levelling compound will be used and we will check if a primer or sealer is needed. 

  • Joints between tiles or other gaps are cemented and levelled.

  • An underlay is used if required to avoid any extra levelling.

  • All traces of grease, chemical residue and glue are removed.

  • There are no stray nails left anywhere and the floor is swept and vacuumed

We recommend removing your old skirting boards, as soon as the new flooring is in place, our qualified joiners can install new or refit the skirting.

Sub-floor Work

  • Contact us for a free quotation.

  • All our work is carried out to the highest standards.

  • We carry public liability insurance to cover all accidents.

  • All our work carries a 12 month guarantee.

For more information

Phone: 07539 687 023